Port of Nueva Palmira (Uruguay)
LOCAL TIME GMT -3
NO RAIN SEASON
Water density: Between 0,997 and 0,9985
Nueva Palmira roads between km 4 and km 5 of River Uruguay with capacity for 3 vessels anchored (1 for each Terminal).
Berth assignment: Priority is given normally according with vessel's arrival to Montevideo roads or Nueva Palmira roads (Whatever corresponds). However berthing priority is subject to decision of respective berth managers according availability of cargo and readiness of export documentation.
On arrival at Montevideo roads / Pilots Station two pilots will board the vessel. Pilots will assist the Vessel during the upstream navigation up to Nueva Palmira.
River passage estimated in about 14 hours. Draft at Martin Garcia Channel is 10,36m with river level 2 feet under keel.
Martin García Channel regulations will be as follows:
DRAFT
10,36m
9,14m
8,84m
8,53m
LOA
up to 245m
245/255 m
over 255/266m LOA
266/277 m
BEAM
upto 32,60 m - with river tide of 2 feet under keel
32,60/35,00 m
or 35,00/41,00 BEAM
41,00/44,00m
For the case in which Vessel’s draft is bellow the allowed depth, and according to her dimensions, the minimum tide height can be decreased to a maximum of 0,30m about zero.
There are two grain terminals available at Nueva Palmira Port: "Corporacion NAVIOS" and "T.G.U."
Both terminals work 24 hours day/shinc. Berthing/unberthing and n during night time is
TERMINALS
Ontur Terminal (External Pier)
Owned and operated by Ontur International. Includes a concrete Pier, 180m long and 1 Dolphin.
• Draft alongside 32,80ft 0 wharton tide level (10,00m)
• Air Draft unlimited
• Loading system: Two Mobile Belts on pier (This terminal is not designed for Grain). Trucks discharge directly to belts
• Loading rate: about 300 m/hr by 2 Loaders -Belts Simultaneously.
• Density of Water: 0,998
• Working hours 24hrs day/ shinc.
• Bunker NOT available.
• Discharge bilges water, slop and garbage NOT available.
• Fresh water available from shore with cost.
• Complies with ISPS and is presently working with security level 1.
Ontur Terminal (Internal Pier)
Owned and operated by Ontur International. Includes a concrete pier, 160m long.
• Draft alongside 28ft 0 wharton tide level (8,50m).
• Air Draft unlimited
• Density of Water: 0,998
• Working hours 24hr day/shinc.
• Bunker NOT available.
• Discharge bilges water, slop and garbage NOT available.
• Fresh water available from shore with cost.
• Owned and operated by Ontur International.
• Complies with ISPS and is presently working with security level 1.-
• There is a cold storage of about 43.000 cbm capacity. Also, a wood pulp warehouse of 30.000 square meters has been built close to the terminal premises.
DRAFT (m) ALONGSIDE:
DWT:
LOA:
BEAM (B):
AIR DRAFT AT ZERO (A):
SILO/WAREHOUSE CAPACITY
VEGOIL TANKS CAPACITY:
LOADING RATE
HSS:
SBM:
V/OIL:
10,00
N/R
225
N/R
21
0
0
320 T/HR
200 T/HR
N/A
(A) AIR DRAFT TO BE ADJUST DEPENDING ON RIVER LEVEL HEIGHT AT THIS AREA.
(B) MAX BEAM – N/R – BUT IF MORE THAN 38 MTS IT IS DIFFICULT TO REACH STARBOARD SIDE WITH LOADING SPOUT.
T.G.U TERMINAL (ANP North Pier)
South and North Piers are owned by the Government, North Section in temporary concession to Terminales Graneleras Uruguayas S.A. (T.G.U. private group). This is a shared pier of 370m long (South Part of pier used for discharge operations). Loading system: Two (2) grain elevators with one hydraulic shooter, the elevator shifts alongside by rail
• Loading rate 800-1.000 mt/h basis one loader
• Bunkers available Only by Truck.
• Provisions, Stores, Spares delivered alongside Vessel.
• Fresh Water Available from Terminal (with charge).
• Security level: 1
• Draft alongside 34 ft. (about 10,36 mtrs) 0 Wharton tide level.
• Working hours 24 hrs day/ shinc.
• Maximum LOA up to CAPESIZE vessels
• Maximum beam in between 43/44 mts
• Air draft up to 22 mts
• Current waiting time: to be checked with Agents.
• Discharge bilges water, slop and garbage not available.
IMPORTANT: IN ORDER TO BERTH IN THIS TERMINAL VESSEL MUST BE ANNOUNCED 5 DAYS PRIOR TO HER ARRIVAL TO MONTEVIDEO IF LAST PORT WAS OTHER THAN ANY SOUTHAMERICAN PORT. IF LAST PORT IS ANY SOUTHAMERICAN PORT MUST BE ANNOUNCED 3 DAYS PRIOR TO HER ARRIVAL.
Important: As this is a shared pier, berthing restrictions apply according to vessels LOA/size.
Additional mooring costs may apply. Waiting times varies.
Navios Terminal North (Pier 1/North Section)
• Security level: 1
• Pier allocation 540m long
• Loading system: Three hydraulic telescopic spouts, though load two (2) at a time
• Loading rate (grain): 800 MT/h upto 1.200 MT/h (depends on cargo distribution on storage site and vessel particulars)
• Loading rate (by-products): 450-500 MT/h upto 1.000 MT/h (depends on cargo distribution on storage site and vessel particulars)
• Air Draft Alongside 21m
• Draft alongside 38ft 0 Wharton tide level (about 11,40m)
• Bunkers Not available.
• Discharge Bilges Water, Slop and Garbage not available.
• Provisions, Stores, Spares delivered only by Boat (with charge).
• Fresh Water Available from Terminal (Slow rate but free of charge)
• Two (2) Tugboats compulsory for berthing/unberthing
• Clearance and Pre-Holds inspection compulsory before berthing (if pier is occupied for previous vessel)
Navios Terminal North (Pier 4/South Section)
A new oceanic pier with 300 meters length and 14 meters beam was added, to operate either ores or grains. The draft alongside is 38ft at zero tide level (11,58m). The pier is equipped with one mobile shiploader that moves along the pier and is supplied by a new loading belt conveyor able to load 1.000 MT/hr for ore cargoes and 800 MT/hr in case of grain, soybean base. This pier is fitted to work simultaneously and independently from the existing one. The air draft restriction in this pier is 22,5m.
An additional pier for barges discharge is incorporated. This pier is equipped with two new cranes with grabs for discharging ores and/or grain. The grab capacity for ore purpose is 9cbm and the grain one is 21cbm.
Both cranes can work simultaneously with the same product and the estimated discharging rate is:
1.000 MT/hr for soybean and 1.500 MT/hr for iron ore.
The stock pile capacity is 700.000MT of iron ore.
The expansion includes a place to receive convoys with a capacity of 20 barges (Mississippi shape).
• Total pier allocation 540m long (existing 240m plus 300m new)
• 14m wide
• Draft alongside 38ft 0 Wharton tide level. (about 11,58m)
• Loading system: One hydraulic telescopic spout able to load with displacement along new pier.
• Air Draft of Spout up to 22,5m
• This pier extension is powered by a new shipping line, nominal loading rate estimated for Iron Ore about 1.500MT/hr, Grain 1.000MT/hr on soyabean basis.
• Thie pier extension can operate simultaneously and independently with the existing one
• The ore storage yard admits a volume of 700,000MT of Iron Ore
• Quantities of Iron Ore to load to be determined by Draft Survey
Navios Terminal North (Pier 4/South Section)